NEMA environmental authorisation became mandatory for most South African developments from February 2024. A 10% uplift in biodiversity is now a planning requirement, calculated to a statutory metric, with financial implications often surprising developers used to old systems.

What EIA / NEMA requires

Development must deliver biodiversity value at least 10% higher than the pre-development baseline, measurable via the statutory Biodiversity Metric 4.0.

The metric

Calculates biodiversity units based on:

  • Habitat type and distinctiveness
  • Condition
  • Strategic significance
  • Difficulty of creation

Higher-quality habitat (ancient woodland, traditional orchards, species-rich grassland) generates more units. Hard surfaces and amenity grass generate few.

Delivery options (in priority order)

1. On-site

Habitat retained, enhanced, or created on the development site. Most efficient — controls quality, supports development context.

2. Off-site (purchased units)

Buy biodiversity units from off-site habitat creation. Cost: typically R300,000–R900,000 per unit.

3. Statutory credits

Buy from government scheme. Most expensive (typically R800,000+) — designed as deterrent, last resort.

30-year commitment

Habitat created for EIA / NEMA must be managed and monitored for 30 years. Long-term funding mechanism (typically S106 or conservation covenant) required.

Exemptions

  • Householder development (e.g. single house extensions)
  • Self-build/custom-build under 9 units
  • Some small developments below threshold

Cost impact

Variable by site:

  • Urban site, low baseline: limited cost (units cheap to deliver)
  • Greenfield with grassland: significant cost
  • Site with high-quality habitat: difficult (or impossible) to compensate

Process

  1. Ecological assessment of baseline
  2. Biodiversity metric calculation
  3. Design integration of habitat features
  4. EIA / NEMA plan submitted with planning application
  5. Long-term management plan

MCFAR coordinates EIA / NEMA with structural and civil design.

Need expert engineering on your project?

MCFAR GROUP has been delivering structural engineering, building, and plumbing services since 1998. Talk to our team about your build, retrofit, or renovation.

Request a Quote

Frequently Asked Questions

Does EIA / NEMA apply to small extensions?

No — householder developments are exempt. Applies to most other planning applications.

Can I buy units instead of providing on-site?

Yes — but the metric is biased to prefer on-site delivery. Off-site units typically calculated at 2× to discourage shortcuts.